Fast enough to keep the mine operator happy.
From the time of order, engineering of the arch structure was completed within one month. An additional month was needed for revisions and changes, due to site constrictions. Site preparation began in early May lasting until mid June and assembly of the Super•Cor® arch was completed within three weeks. Backfilling and wall assembly was completed within six weeks.
"AIL's engineering expertise and experience with large arches gave us the confidence to proceed with this essential installation. They also provided us with effective support throughout the project and proved to be a strong partner."
- Cardinal River Coal General Manager, Lloyd Metz
The AIL difference.
AIL provided on-site technical assistance throughout the construction. That assistance ranged from training crews on optimum assembly methods, providing input on solutions to construction issues such as backfill quality and compaction methods, and providing experts on its wire wall system for installation efficiency. "AIL provided on-site technical specialists that were phenomenal," says Wes Erickson of Formula Contractors Ltd. "They went to great lengths to help us provide quality workmanship, increase our production, and achieve our very tight schedule." Over and above, AIL provided research engineers to conduct three days of testing to determine the strain induced on the structure by the heaviest vehicles.
|