» Find a Representative  | 1-877-245-7473

Home » Projects » Mining

Mining Projects

Successful mine managers choose efficient mine site solutions from AIL to let them build in efficiencies from the ground up.

quarry-index-thumbInnovative crusher wall installation avoids extra costs.When the water table ruled out an excavated pit-style crusher wall installation, AIL’s Vist-A-Walls rose to the occasion by doubling as a truck ramp.

» Explore this project

Twin Super•Cor® Arches in Australia.Urgent bridge replacement: from start to finish in 120 days.On an accelerated schedule, the AIL Group manufactured, delivered and installed twin Super•Cor Structural Plate Arches, getting trains back on track in 120 days.

» Explore this project

AIL builds world’s largest corrugated arch using Super•CorAIL engineers world’s largest corrugated arch.On an accelerated schedule, AIL designed and fabricated the world’s largest corrugated arch using Super•Cor for Whitehorse Creek, AB, coal mine.

» Explore this project

Super•Cor steel arch spans creek.Strong, economical, green solution for heavy haul road.Super•Cor Steel Arch spans 20 m without disturbing waterway and saves client time and money over conventional concrete bridging options.

» Explore this project

Dry Fork Station, Basin Electric
Adding value in Wyoming haul road crossing.AIL Group’s Super•Cor and Vist-A-Walls provided great value for Wyoming power plant by saving customer money on material, shipping and assembly.

» Explore this project

Heavy haul road arch system at Nammuldi Mine, Australia.
No traffic interruptions building Super•Cor haul road arches.Atlantic Civil Products, a major AIL licensee in Australia , faced a big challenge when they committed to constructing a two-lane heavy haul road arch above an existing rail line.

» Explore this project