Home » Projects » Transportation

Transportation Projects

In the competitive world of transportation infrastructure construction, companies are choosing to partner with AIL for their experience and cost-effective solutions.

036(index)Fast replacement gets displaced residents home early.
AIL helps get displaced residents home just before the holidays with our speedy bridge replacement solution.

» Explore this project

East-West4(thumb)From east to west, Big R’s bridges save time and money.Two recent pedestrian bridge installations on opposite sides of the continent are proof positive that Big R Prefabricated Bridges are an excellent choice to accelerate projects and reduce bottom lines.

» Explore this project

AIL’s Vist-A-Walls in Edmonton 23rd Avenue interchange project.25 MSE Structural Walls for Edmonton mega-project.
Saving time and money for the client, 25 MSE Precast Panel Walls from AIL were chosen to be installed in the Edmonton 23rd Avenue interchange project.

» Explore this project


Super•Cor Arches and Vist-A-Walls in Banff wildlife crossing.AIL’s wildlife crossings making Banff highways safer.
AIL’s Super•Cor Arches and Vist-A-Walls with Precast Concrete Panels are keeping people and animals safer with efficient wildlife crossings on the Banff highway.

» Explore this project

AIL’s Vist-A-Walls in Sea-to-Sky Highway project.Our team gets “between a rock and a hard place”.
Overcoming many challenges, AIL supplied 65 MSE Structural Walls on the Sea-to-Sky Highway from Vancouver to Whistler for the 2010 Games..

» Explore this project

Bolt-A-Plate Structural Plate bends with creek.Stream crossing bends with meandering creek
Bolt-A-Plate Structural Plate bends with seven elbows to follow winding creek, saving money, time and environmental impact for new road in Canton, GA.

» Explore this project

AIL’s Vist-A-Walls used for Edmonton Ring Road project.22 Vist-A-Walls keep pace with Edmonton ring road project.
Vist-A-Walls were designed, manufactured and shipped within four weeks for each site of 21 km ring road project in Edmonton, Alberta.

» Explore this project


The Wire Wall is constructed first in AIL’s Two-Stage Precast Walls.Jacksonville interchange chooses two AIL Wall Systems.
MSE Precast Panel Walls and Two-Stage Precast Walls allow for different soil settlement ranges while still looking good in a Jacksonville, FL, interchange project. 

» Explore this project

The total weight of CPR’s trains is supported by Super•Cor bridge.Super•Cor supports one of Canada's major highways
The Canadian Pacific Railway faced a challenge when creating a grade separation for trains and trucks heading in and out of their intermodal yard in Kleinberg, ON. Big R had the solution.

» Explore this project

AIL’s temporary and permanent Precast Panel Walls cover 110,000 sq. ft.Permanent and temporary walls for Florida interchange.
AIL’s permanent Precast Panel Walls and temporary Welded Wire Walls figure prominently in Florida I-75 interchange project.

» Explore this project

A custom motif on a Vancouver bridge.Major Vancouver transportation link chooses Vist-A-WallsAIL and Vist-A-Walls were a natural choice for Wire Walls and Precast Panel Walls on Golden Ears Bridge project in Vancouver.

» Explore this project


Traffic flows as Vist-A-Walls supports bridge and embankment.Temporary and permanent walls are used in a tight spot.
Permanent and temporary Vist-A-Walls provided cost-effective and efficient support to a construction bridge and large embankment while a new highway and bridge were built.

» Explore this project

Lifting AIL’s MSE Structural Walls into place.Vist-A-Walls help meet tight deadline in Mission Valley, BC.
AIL’s Vist-A-Walls as bridge abutments provide flexible and fast solution for mall construction project with extremely tight deadline.

» Explore this project


Dur•A•Span makes 30 km access road accessible for all concernedDur•A•Span makes 30 km access road accessible for all.
Corrosion-resistant Dur•A•Span pipe used in stream crossing when faced with the challenge of designing a 30-kilometre access road to connect the St. Lewis to the Trans Labrador Highway.

» Explore this project

Super•Cor Box Culvert on Alaska Highway.AIL products flex muscles in key bridge replacement.
A Super•Cor Box Culvert was used in a key bridge replacement on the Alaska Highway because of its strength, wider mouth opening, and long span capability.

» Explore this project


Salt water flows through Dur•A•Span Box Culvert.Dur•A•Span weathers years of saltwater conditions.
Dur•A•Span Box Culvert provides decades of maintenance-free service in harsh saltwater and ice conditions on Strong’s Island, NL.

» Explore this project


Constructing Super•Cor Arch in Cobequid Pass, NS.Large span requirement and driver safety major factors in choosing Super•Cor.
Super•Cor Arch was chosen for its large span capabilities, strength and driver safety.

» Explore this project