March 11, 2024
When MTQ needed to install a replacement stream-crossing solution in a remote area on the Gaspé Peninsula, a twin Bolt-A-Plate Round solution was selected. The new 3.36 m diameter structures replaced one aging 2.75 m culvert running under the rail bed near Chandler, QC.
Given the deep-cover requirements of this site, we value engineered the structures for maximum strength at reduced cost. These aspects added some complexity to the plate-assembly task for the contractor, Hamel Construction, but our on-site representative was able to assist with some support from our regional engineer.
The structures were installed at two different elevations. One was installed at a lower upstream elevation as a fish-passage solution with custom baffle inserts. A cast-in-place concrete wall provided extra support and washout resilience for both culverts at the upstream end.
In the end, all parties were pleased with the project outcome and another Bolt-A-Plate order came in this year with the same contractor and the same team.
Best-Kote Buried Bridge Coating delivers over 75 years of service
Building on the years of proven performance of polymer-coated corrugated steel pipe, AIL has partnered with some of the world’s leading developers of coatings to provide Best-Kote Buried Bridge Coating. For extended service life of Super-Cor and Bolt-A-Plate buried arch bridges, tunnels and pipe culverts, Best-Kote offers superior protection and long-term durability.